01 / Site work, demolition and waste documentation
Step 1 · Where it starts
A job record that opens with the site, the scope and the hazards already identified, so nobody starts a demolition file from an empty page.
Step 2 · What gets automated
Manifests, disposal receipts, air monitoring results and daily reports are read and filed against the right job and date, rather than accumulating in a truck and a shared inbox.
Step 3 · The process it plugs into
Every load leaving a site is tied to a manifest and a destination, and any gap between what left and what was received shows up while the job is still open.
Step 4 · SolaceSentry review
A competent person reviews the daily package before it is closed. Anything involving regulated material is held until a qualified name is attached to it.
Step 5 · What leaves the system
A close-out package assembled as the job runs instead of reconstructed six weeks after demobilisation.
Proof metric: Days between final demobilisation and a complete close-out package delivered to the owner.